PP plastic formwork is a moulded polypropylene shuttering system bought once and used across many pours, and that is exactly how contractors and panel rental yards judge it. The figure that matters is not the price of a panel but the price divided by the number of pours it survives, plus everything the panel saves or costs during those pours: release agent, cleaning labour, patching, spares, transport and storage. Two panel series cover the work, a 78 mm section for the main area of a set and a 65 mm section for make-up panels and smaller faces, and the two carry different cycle ratings.
1. Two Series, Two Cycle Ratings
Reuse is a property of the build, not of the material name. The 78 mm panel is the main area panel in a set and is rated for 80 to 100 reuses when the set is handled the way the rating assumes. The 65 mm panel is the make-up and repair panel, used on small faces, infill bays, edge strips and cut sections, and it is rated at about 50 reuses. Both figures are counted per panel, not per pour of the project, and they assume the stripping and cleaning routine described below.
2. Cost per Pour, Not Panel Price
Compare two shuttering options the way a costing sheet does. A panel that lasts 80 to 100 pours spreads its cost across 80 to 100 uses; a panel that lasts 50 spreads the same figure across half as many. Where cycle ratings differ that far, the rating decides which panel costs less per pour, even when that panel carries the higher list price. Beyond the panel line sit the costs the panel itself drives: release agent, the labour to clean and stack the set between pours, replacement of damaged singles, and the volume taken by transport and site storage. A longer life changes all of them, because a set that keeps its dimensions and its face goes back up without being re-fitted, patched or replaced in the middle of a project.
3. What Preserves the Rating on Site
The rating is kept or lost in the stripping routine. Panels are lifted straight off the concrete rather than levered against the face, and they are dragged as little as possible, because the face and the corners carry the value of the panel. Cleaning is done with water and a soft tool; metal scrapers and hammer blows take the edge off a moulded section that still has hundreds of square metres of service in it. Panels are stacked flat on site rather than on edge, and offcuts are taken on the smallest panel in the set, which is why a sensible order includes make-up panels to absorb the cuts and the repairs instead of the main area panels. Nothing is nailed or screwed, so the same set goes back up on the next floor without patched holes, and the accessory set of handles, tie rods, walers, props and diagonal braces is packed with the panels so that nothing is lost between phases.
Specifications
| Item | Typical specification |
| Material | Virgin polypropylene, injection moulded |
| Panel size | 1500 x 1200 mm standard panel, other sizes on request |
| Panel section | 65 mm and 78 mm moulded sections |
| Panel weight | 10.13 kg to 27.00 kg depending on size and section |
| Surface finish | Smooth moulded face, washed with water between pours |
| Reuse | 78 series 80 to 100 reuses, 65 series about 50 reuses |
| Application | Wall, column, slab and foundation formwork, water and sewage structures, repeat residential floors |
| MOQ | Quoted per project |
For detailed dimensions or custom sizes, please contact us.
Where It Is Used
PP plastic formwork is bought as a set for a structure with a repeating layout: residential towers with the same floor plan on every level, hotel and hospital cores, water tanks and sewage structures, foundations and retaining walls. The set is then rotated floor by floor, with the 78 mm panels carrying the main areas and the 65 mm panels taking the make-up work, so a project can be costed at a known number of pours per panel instead of a new panel for every section.
Send Your Requirement