Are you a trading company or a manufacturer?
Firstly, we are a subsidiary foreign trade company of a group company, mainly responsible for operating the export business of formwork and scaffolding products for the group company. Secondly, our group company has two major production bases, specializing in the production and processing of formwork and scaffolding products for over 20 years.
How can I get a quotation?
If you are a simple concrete pouring project, such as walls, swimming pools, main structures, and basements, and you have your own engineer, you can directly provide us with a bill of materials, and we will provide you with a quotation according to the bill of materials. If you are a concrete pouring project for apartments, residences, villas, etc., and need to use plastic formwork products as a whole, our professional consultants will communicate with you in detail. After you provide us with the engineering architectural drawings and structural drawings, our engineers will develop an application plan for you and provide you with a quotation based on the specific plan.
How long does it usually take to complete the plan and quotation after we provide the engineering architectural drawings and structural drawings?
Generally, it takes about 5-8 days to complete the specific plan and detailed quotation.
Can you provide free samples?
Yes, we can provide samples. You will need to pay for the shipping cost.
How long is the estimated delivery time after the contract is signed?
According to the complexity of the project, it usually takes 30-60 days to complete the stocking. We will estimate a more accurate delivery time for you during the planning and quotation process.
Is the plastic template prone to deformation?
If the construction environment where the project is located belongs to long-term high temperature, the increase in temperature of the concrete pouring project may cause slight deformation of the formwork. It is recommended to use all aluminum alloy formwork or steel frame wood formwork system in high temperature areas.
What are the defects of the plastic template system?
The load force is too small to complete the construction of large-sized concrete structures; Poor high temperature resistance, slight deformation may occur when used in high-temperature areas.
What is the payment method you require?
Payment ≤ 1,000 USD: 100% in advance
Payment ≥ 10,000 USD: 30% T/T in advance, balance before shipment
Or L/C (Letter of Credit)